September 1, 2023 14:50:15
Load Control Status
loadcontrolandgraph.htm.html
Estimated Load Control End Time
Other
IN2 */IR1 *
Minute
0
Load Type
Date/Time (Current)
Load Status
Air Conditioners (AIR *)
9/1/2023 13:11
OFF
Data Center (DAT1)
9/1/2023 12:23
OFF
Demand Controllers (DM1 *)
9/1/2023 13:11
OFF
Heat Storage Central (HSC *)
7/21/2023 00:10
ON
Industrial 1 5/7 Alert (BI1 *)
8/24/2023 20:09
ON
Industrial 1 Voluntary (IN1 *)
9/1/2023 12:30
OFF
Industrial 2 5/7 Direct Control (BI2 1-4)
8/23/2023 21:38
ON
Industrial 2 5/7 Direct Control (BI2 5-8)
8/24/2023 19:48
ON
Industrial 2 5/7 Direct Control (BI2 9-12)
8/24/2023 19:52
ON
Industrial 2 Direct Control (IN2 *)
9/1/2023 13:12
OFF
Industrial Heat (IH1 *)
7/21/2023 00:10
ON
Irrigation 1-4 (IR1 1-4)
9/1/2023 13:20
OFF
Irrigation 5-8 (IR1 5-8)
9/1/2023 13:53
OFF
Irrigation 9-12 (IR1 9-12)
9/1/2023 13:58
OFF
Water Heater 01 (WAT 1)
9/1/2023 14:02
ON
Water Heater 02 (WAT 2)
9/1/2023 14:12
ON
Water Heater 03 (WAT 3)
9/1/2023 14:22
ON
Water Heater 04 (WAT 4)
9/1/2023 14:32
ON
Water Heater 05 (WAT 5)
9/1/2023 12:42
OFF
Water Heater 06 (WAT 6)
9/1/2023 12:42
OFF
Water Heater 07 (WAT 7)
9/1/2023 12:42
OFF
Water Heater 08 (WAT 8)
9/1/2023 12:42
OFF
Water Heater 09 (WAT 9)
9/1/2023 12:46
OFF
Water Heater 10 (WAT 10)
9/1/2023 12:46
OFF
Water Heater 11 (WAT 11)
9/1/2023 12:46
OFF
Water Heater 12 (WAT 12)
9/1/2023 12:46
OFF
Hour
Hour
22
Minute
0
Hour
Hour
22