April 13, 2021 06:10:04
Load Control Status
LoadControlStatus.html
Estimated Load Control End Time
Other
IN2 */IR1 *
Minute
0
Load Type
Date/Time (Current)
Load Status
Air Conditioners (AIR *)
2/17/2021 05:52
ON
Demand Controllers (DM1 *)
4/1/2021 10:57
ON
Heat Storage Central (HSC *)
4/12/2021 23:30
ON
Industrial 1 5/7 Alert (BI1 *)
2/16/2021 11:15
ON
Industrial 1 Voluntary (IN1 *)
4/1/2021 10:52
ON
Industrial 2 5/7 Direct Control (BI2 1-4)
2/16/2021 11:15
ON
Industrial 2 5/7 Direct Control (BI2 5-8)
2/16/2021 10:55
ON
Industrial 2 5/7 Direct Control (BI2 9-12)
2/16/2021 10:43
ON
Industrial 2 Direct Control (IN2 *)
4/1/2021 10:52
ON
Industrial Heat (IH1 *)
4/1/2021 10:57
ON
Irrigation 1-4 (IR1 1-4)
4/1/2021 10:47
ON
Irrigation 5-8 (IR1 5-8)
4/1/2021 10:47
ON
Irrigation 9-12 (IR1 9-12)
4/1/2021 10:47
ON
Water Heater 01 (WAT 1)
4/1/2021 09:53
ON
Water Heater 02 (WAT 2)
4/1/2021 10:01
ON
Water Heater 03 (WAT 3)
4/1/2021 10:11
ON
Water Heater 04 (WAT 4)
4/1/2021 10:21
ON
Water Heater 05 (WAT 5)
4/1/2021 10:30
ON
Water Heater 06 (WAT 6)
4/1/2021 10:59
ON
Water Heater 07 (WAT 7)
4/1/2021 10:42
ON
Water Heater 08 (WAT 8)
4/1/2021 10:36
ON
Water Heater 09 (WAT 9)
4/1/2021 08:54
ON
Water Heater 10 (WAT 10)
4/1/2021 09:10
ON
Water Heater 11 (WAT 11)
4/1/2021 09:23
ON
Water Heater 12 (WAT 12)
4/1/2021 09:39
ON
Hour
Hour
0
Minute
0
Hour
Hour
0