April 1, 2020 13:10:03
Load Control Status
LoadControlStatus.html
Estimated Load Control End Time
Other
IN2 */IR1 *
Minute
0
Load Type
Date/Time (Current)
Load Status
Air Conditioners (AIR *)
1/20/2020 10:53
ON
Demand Controllers (DM1 *)
4/1/2020 11:59
ON
Heat Storage Central (HSC *)
4/1/2020 06:35
OFF
Industrial 1 5/7 Alert (BI1 *)
2/20/2020 08:32
ON
Industrial 1 Voluntary (IN1 *)
4/1/2020 11:55
ON
Industrial 2 5/7 Direct Control (BI2 1-4)
2/13/2020 10:18
ON
Industrial 2 5/7 Direct Control (BI2 5-8)
2/13/2020 10:10
ON
Industrial 2 5/7 Direct Control (BI2 9-12)
2/13/2020 10:06
ON
Industrial 2 Direct Control (IN2 *)
4/1/2020 11:55
ON
Industrial Heat (IH1 *)
4/1/2020 11:59
ON
Irrigation 1-4 (IR1 1-4)
4/1/2020 11:50
ON
Irrigation 5-8 (IR1 5-8)
4/1/2020 11:50
ON
Irrigation 9-12 (IR1 9-12)
4/1/2020 11:50
ON
Water Heater 01 (WAT 1)
4/1/2020 10:39
ON
Water Heater 02 (WAT 2)
4/1/2020 10:54
ON
Water Heater 03 (WAT 3)
4/1/2020 11:05
ON
Water Heater 04 (WAT 4)
4/1/2020 11:19
ON
Water Heater 05 (WAT 5)
4/1/2020 11:39
ON
Water Heater 06 (WAT 6)
4/1/2020 11:44
ON
Water Heater 07 (WAT 7)
4/1/2020 12:01
ON
Water Heater 08 (WAT 8)
4/1/2020 12:01
ON
Water Heater 09 (WAT 9)
4/1/2020 12:06
ON
Water Heater 10 (WAT 10)
4/1/2020 12:06
ON
Water Heater 11 (WAT 11)
4/1/2020 10:03
ON
Water Heater 12 (WAT 12)
4/1/2020 10:13
ON
Hour
Hour
0
Minute
0
Hour
Hour
0