September 28, 2020 14:10:04
Load Control Status
LoadControlStatus.html
Estimated Load Control End Time
Other
IN2 */IR1 *
Minute
0
Load Type
Date/Time (Current)
Load Status
Air Conditioners (AIR *)
9/24/2020 19:57
ON
Demand Controllers (DM1 *)
9/24/2020 19:57
ON
Heat Storage Central (HSC *)
4/30/2020 23:30
ON
Industrial 1 5/7 Alert (BI1 *)
8/27/2020 20:58
ON
Industrial 1 Voluntary (IN1 *)
9/24/2020 20:03
ON
Industrial 2 5/7 Direct Control (BI2 1-4)
8/27/2020 20:58
ON
Industrial 2 5/7 Direct Control (BI2 5-8)
8/27/2020 20:58
ON
Industrial 2 5/7 Direct Control (BI2 9-12)
8/27/2020 20:58
ON
Industrial 2 Direct Control (IN2 *)
9/24/2020 20:03
ON
Industrial Heat (IH1 *)
4/14/2020 09:00
ON
Irrigation 1-4 (IR1 1-4)
9/22/2020 20:38
ON
Irrigation 5-8 (IR1 5-8)
9/22/2020 20:38
ON
Irrigation 9-12 (IR1 9-12)
9/22/2020 20:38
ON
Water Heater 01 (WAT 1)
9/24/2020 18:22
ON
Water Heater 02 (WAT 2)
9/24/2020 18:11
ON
Water Heater 03 (WAT 3)
9/24/2020 18:35
ON
Water Heater 04 (WAT 4)
9/24/2020 18:29
ON
Water Heater 05 (WAT 5)
9/24/2020 20:19
ON
Water Heater 06 (WAT 6)
9/24/2020 20:28
ON
Water Heater 07 (WAT 7)
9/24/2020 20:34
ON
Water Heater 08 (WAT 8)
9/24/2020 20:53
ON
Water Heater 09 (WAT 9)
9/24/2020 19:00
ON
Water Heater 10 (WAT 10)
9/24/2020 19:06
ON
Water Heater 11 (WAT 11)
9/24/2020 19:16
ON
Water Heater 12 (WAT 12)
9/24/2020 19:29
ON
Hour
Hour
0
Minute
0
Hour
Hour
0